Orangery extensions for homes in Renfrew
If you live in Renfrew and want more space without moving, an orangery extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in RenfrewFrom £29,000 inc VAT
- PlanningScottish householder rules; building warrant needed
- Build time10–16 weeks on site
- Postcode districtsPA1, PA4

Guide prices for Renfrew
For Renfrew we adjust our national guide rates by ×0.98, the factor we use for Scotland. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Renfrew: £2,350 to £4,410 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £29,000 – £36,000 | £32,500 – £41,500 | £39,500 – £53,000 |
| 4 m × 4 m 16 m² | £37,500 – £45,500 | £43,500 – £55,000 | £53,000 – £71,000 |
| 4 m × 6 m 24 m² | £56,000 – £68,500 | £65,500 – £82,500 | £79,500 – £106,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Working in Renfrew
We cover Renfrew and the postcode districts PA1, PA4. Nearby, we also take on projects in Erskine (3 miles), Paisley (3 miles), Barrhead (5 miles), Johnstone (6 miles).
Scotland's housing includes sandstone villas, terraces and tenements in the cities and plenty of post-war and modern houses and bungalows elsewhere. A building warrant is needed before work starts.
What is included
- Foundations, walls and insulated perimeter roof
- Design of piers, roof perimeter and lantern proportions
- Opening into the main house
- Heating sized for the glass area
- Aluminium or timber lantern and full-height glazing
Planning and approvals in Renfrew
In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted. Separately, almost every extension needs a building warrant from the council before work starts.
In a conservation area or national scenic area the householder permitted development rights are more limited, listed homes need listed building consent, and if rights have been removed by a condition or direction, any extension needs an application.
Building close to a public sewer needs the agreement of Scottish Water, which we check during design.
Scotland has no Party Wall Act. Where work affects a shared wall or a neighbour's land, we agree access, protection and making good with your neighbour in writing before work starts.
Applications are decided by your council as planning authority.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Renfrew home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about orangery extensions
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Renfrew, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does an orangery extension take to build in Renfrew?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Will my neighbours in Renfrew be involved?
If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.
How much does an orangery cost?
Our guide range is about £2,350 to £4,410 per m² including VAT, so a 16 m² standard-spec orangery is typically £43,500 to £55,000 in Renfrew.
Will an orangery be too hot in summer?
Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.
Book a free site visit in Renfrew
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.