house-extension.uk

Mitcham orangery extensions, designed and built

If you live in Mitcham and want more space without moving, an orangery extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in MitchamFrom £39,000 inc VAT
  • PlanningSame limits as single-storey rear; glazing checked for building regs
  • Build time10–16 weeks on site
  • Postcode districtsCR4, SM4, SM5, SW16, SW17
Orangery extension with brick piers, a glass roof lantern and French doors

Local to Mitcham

We cover Mitcham and the postcode districts CR4, SM4, SM5, SW16, SW17, SW19. We also work in nearby Morden (1 mile), Tooting (2 miles), Wimbledon (2 miles), Streatham (2 miles).

London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.

Orangery extension prices in Mitcham

These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Mitcham: £3,120 to £5,850 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£39,000 – £47,500£43,500 – £55,000£53,000 – £70,500
4 m × 4 m
16 m²
£49,500 – £60,500£58,000 – £73,000£70,500 – £94,000
4 m × 6 m
24 m²
£74,500 – £90,500£87,000 – £109,500£106,000 – £140,500

For a figure based on your own dimensions, use our guide-price tool.

Is an orangery extension right for your house?

  • Homeowners replacing an older conservatory
  • Period and detached houses with a garden view
  • Those who want daylight without overheating

Planning rules that apply in Mitcham

In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions people ask about orangery extensions

Do you cover all of Mitcham?

Yes. We cover Mitcham and the surrounding parts of Greater London. Site visits are free and there is no obligation.

Who do I contract with for an orangery extension in Mitcham?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does an orangery extension take to build in Mitcham?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Does an orangery need planning permission?

It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.

What is the difference between an orangery and a conservatory?

An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.

Book a free site visit in Mitcham

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote