house-extension.uk

Lerwick orangery extensions, designed and built

Lerwick projects are quoted by arrangement: we plan the design, approvals and build carefully around travel and material deliveries, and confirm any travel costs up front.

  • Guide price in LerwickFrom £29,000 inc VAT
  • PlanningScottish householder rules; building warrant needed
  • Build time10–16 weeks on site
  • Postcode districtsZE1
Orangery extension with brick piers, a glass roof lantern and French doors

Orangery extension prices in Lerwick

For Lerwick we adjust our national guide rates by ×0.98, the factor we use for Scotland. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Lerwick: £2,350 to £4,410 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£29,000 – £36,000£32,500 – £41,500£39,500 – £53,000
4 m × 4 m
16 m²
£37,500 – £45,500£43,500 – £55,000£53,000 – £71,000
4 m × 6 m
24 m²
£56,000 – £68,500£65,500 – £82,500£79,500 – £106,000

For a figure based on your own dimensions, use our guide-price tool.

Local to Lerwick

Across ZE1, we can visit, measure and advise. Island and remote projects are planned individually, with travel, deliveries and accommodation for the team agreed before the survey.

Scotland's housing includes sandstone villas, terraces and tenements in the cities and plenty of post-war and modern houses and bungalows elsewhere. A building warrant is needed before work starts.

Is an orangery extension right for your house?

  • Those who want daylight without overheating
  • Period and detached houses with a garden view
  • Homeowners replacing an older conservatory

Will the council need to approve it?

In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted. Separately, almost every extension needs a building warrant from the council before work starts.

In a conservation area or national scenic area the householder permitted development rights are more limited, listed homes need listed building consent, and if rights have been removed by a condition or direction, any extension needs an application.

Building close to a public sewer needs the agreement of Scottish Water, which we check during design.

Applications are decided by your council as planning authority.

Our process, step by step

Visits to Lerwick are arranged around travel; we confirm any travel costs in writing before the survey.

  1. Site visit by arrangement

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions people ask about orangery extensions

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Lerwick, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Who do I contract with for an orangery extension in Lerwick?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does an orangery extension take to build in Lerwick?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

What is the difference between an orangery and a conservatory?

An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.

Will an orangery be too hot in summer?

Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.

Talk to us about a project in Lerwick

We will talk through the project, the planning position and how we would organise the visit and the build.

  • Site visit arranged around travel, costs agreed first
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Send us your project details

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote