Lancing orangery extensions, designed and built

Our design and build teams take on orangery extensions in Lancing, from the first measured survey through planning and building control to the finished room.

  • Guide price in LancingFrom £33,500 inc VAT
  • PlanningSame limits as single-storey rear; glazing checked for building regs
  • Build time10–16 weeks on site
  • Postcode districtsBN15
Orangery extension with brick piers, a glass roof lantern and French doors

What should I budget for an orangery extension in Lancing?

Prices below are for Lancing, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Lancing: £2,690 to £5,040 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£33,500 – £41,000£37,500 – £47,500£45,500 – £60,500
4 m × 4 m
16 m²
£43,000 – £52,000£50,000 – £63,000£60,500 – £81,000
4 m × 6 m
24 m²
£64,500 – £78,000£75,000 – £94,500£91,000 – £121,000

For a figure based on your own dimensions, use our guide-price tool.

Working in Lancing

Site visits are available across Lancing (BN15). Nearby, we also take on projects in Shoreham-by-Sea (2 miles), Worthing (2 miles), Littlehampton (10 miles), Burgess Hill (12 miles).

For homes towards East Sussex, Portslade is around 5 miles away. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.

Planning and approvals in Lancing

In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.

The planning position for a specific Lancing address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What we take care of

  • Design of piers, roof perimeter and lantern proportions
  • Aluminium or timber lantern and full-height glazing
  • Foundations, walls and insulated perimeter roof
  • Opening into the main house
  • Heating sized for the glass area

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Common questions in Lancing

Who do I contract with for an orangery extension in Lancing?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Lancing, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do you cover all of Lancing?

Yes. We cover Lancing and the surrounding parts of West Sussex. Site visits are free and there is no obligation.

Will an orangery be too hot in summer?

Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.

Does an orangery need planning permission?

It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.

Book a free site visit in Lancing

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote