house-extension.uk

Dover orangery extensions, designed and built

If you live in Dover and want more space without moving, an orangery extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in DoverFrom £33,500 inc VAT
  • PlanningSame limits as single-storey rear; glazing checked for building regs
  • Build time10–16 weeks on site
  • Postcode districtsCT16, CT17
Orangery extension with brick piers, a glass roof lantern and French doors

What should I budget for an orangery extension in Dover?

Prices below are for Dover, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Dover: £2,690 to £5,040 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£33,500 – £41,000£37,500 – £47,500£45,500 – £60,500
4 m × 4 m
16 m²
£43,000 – £52,000£50,000 – £63,000£60,500 – £81,000
4 m × 6 m
24 m²
£64,500 – £78,000£75,000 – £94,500£91,000 – £121,000

For a figure based on your own dimensions, use our guide-price tool.

Working in Dover

Our survey diary covers Dover, including CT16, CT17. Neighbouring towns we cover include Folkestone (7 miles), Deal (8 miles), Canterbury (15 miles), Ramsgate (15 miles).

The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

When an orangery extension makes sense

  • Homeowners replacing an older conservatory
  • Those who want daylight without overheating
  • Period and detached houses with a garden view

Will the council need to approve it?

In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.

The planning position for a specific Dover address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Your questions about an orangery extension in Dover

How long does an orangery extension take to build in Dover?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Do you cover all of Dover?

Yes. We cover Dover and the surrounding parts of Kent. Site visits are free and there is no obligation.

Who do I contract with for an orangery extension in Dover?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Does an orangery need planning permission?

It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.

How much does an orangery cost?

Our guide range is about £2,690 to £5,040 per m² including VAT, so a 16 m² standard-spec orangery is typically £50,000 to £63,000 in Dover.

Book a free site visit in Dover

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote