Orangery extensions in Chesham
A orangery extension in Chesham starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in CheshamFrom £33,500 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsHP5, HP6

Extensions in and around Chesham
Site visits are available across Chesham (HP5, HP6). Nearby, we also take on projects in Amersham (2 miles), Chalfont St Peter (7 miles), High Wycombe (8 miles), Gerrards Cross (8 miles).
Berkhamsted, in Hertfordshire, is roughly 4 miles from Chesham and also on our list. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
What we take care of
- Heating sized for the glass area
- Thermal calculations where glazing is generous
- Design of piers, roof perimeter and lantern proportions
- Aluminium or timber lantern and full-height glazing
Guide prices for Chesham
Prices below are for Chesham, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Chesham: £2,690 to £5,040 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £33,500 – £41,000 | £37,500 – £47,500 | £45,500 – £60,500 |
| 4 m × 4 m 16 m² | £43,000 – £52,000 | £50,000 – £63,000 | £60,500 – £81,000 |
| 4 m × 6 m 24 m² | £64,500 – £78,000 | £75,000 – £94,500 | £91,000 – £121,000 |
For a figure based on your own dimensions, use our guide-price tool.
Do I need planning permission in Chesham?
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Chesham
Who do I contract with for an orangery extension in Chesham?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Chesham?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Chesham?
Yes. We cover Chesham and the surrounding parts of Buckinghamshire. Site visits are free and there is no obligation.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
Will an orangery be too hot in summer?
Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.
Book a free site visit in Chesham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.