house-extension.uk

Orangery extensions for homes in Brockley

Brockley homeowners can use us for the whole orangery extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in BrockleyFrom £39,000 inc VAT
  • PlanningSame limits as single-storey rear; glazing checked for building regs
  • Build time10–16 weeks on site
  • Postcode districtsSE4, SE8, SE13, SE14, SE15
Orangery extension with brick piers, a glass roof lantern and French doors

Included in a typical project

  • Opening into the main house
  • Foundations, walls and insulated perimeter roof
  • Aluminium or timber lantern and full-height glazing
  • Thermal calculations where glazing is generous

The lantern-to-roof ratio sets the character. A wider solid perimeter gives a calmer, more room-like space and hides downlights and speakers; a bigger lantern feels brighter but needs more care against summer heat.

Working in Brockley

Across SE4, SE8, SE13, SE14, SE15, SE22, we can visit, measure and advise. We also work in nearby New Cross (1 mile), Greenwich (1 mile), Catford (1 mile), Peckham (2 miles).

London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.

How much does an orangery extension cost in Brockley?

Prices below are for Brockley, using the London factor of ×1.3. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Brockley: £3,120 to £5,850 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£39,000 – £47,500£43,500 – £55,000£53,000 – £70,500
4 m × 4 m
16 m²
£49,500 – £60,500£58,000 – £73,000£70,500 – £94,000
4 m × 6 m
24 m²
£74,500 – £90,500£87,000 – £109,500£106,000 – £140,500

Want a range for your exact size? The guide-price tool takes about a minute.

Planning and approvals in Brockley

In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions people ask about orangery extensions

How long does an orangery extension take to build in Brockley?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Do you cover all of Brockley?

Yes. We cover Brockley and the surrounding parts of Greater London. Site visits are free and there is no obligation.

Will my neighbours in Brockley be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Does an orangery need planning permission?

It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.

What is the difference between an orangery and a conservatory?

An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.

Book a free site visit in Brockley

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote