Orangery extensions for homes in Bonnyrigg
Bonnyrigg homeowners can use us for the whole orangery extension project: survey, design, planning or permitted development checks, the building warrant and the build itself.
- Guide price in BonnyriggFrom £29,000 inc VAT
- PlanningScottish householder rules; building warrant needed
- Build time10–16 weeks on site
- Postcode districtsEH18, EH19, EH22, EH24

Guide prices for Bonnyrigg
For Bonnyrigg we adjust our national guide rates by ×0.98, the factor we use for Scotland. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Bonnyrigg: £2,350 to £4,410 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £29,000 – £36,000 | £32,500 – £41,500 | £39,500 – £53,000 |
| 4 m × 4 m 16 m² | £37,500 – £45,500 | £43,500 – £55,000 | £53,000 – £71,000 |
| 4 m × 6 m 24 m² | £56,000 – £68,500 | £65,500 – £82,500 | £79,500 – £106,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
What we take care of
- Aluminium or timber lantern and full-height glazing
- Thermal calculations where glazing is generous
- Design of piers, roof perimeter and lantern proportions
- Opening into the main house
- Foundations, walls and insulated perimeter roof
The lantern-to-roof ratio sets the character. A wider solid perimeter gives a calmer, more room-like space and hides downlights and speakers; a bigger lantern feels brighter but needs more care against summer heat.
Will the council need to approve it?
In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted.
The planning position for a specific Bonnyrigg address depends on its history and any designations, which is why we check it at the first visit.
In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.
Scotland has no Party Wall Act. Where work affects a shared wall or a neighbour's land, we agree access, protection and making good with your neighbour in writing before work starts.
Applications are decided by your council as planning authority.
Covering Bonnyrigg
Site visits are available across Bonnyrigg (EH18, EH19, EH22, EH24). We also work in nearby Musselburgh (5 miles), Penicuik (6 miles), Edinburgh (6 miles), Broxburn (15 miles).
Scotland's housing includes sandstone villas, terraces and tenements in the cities and plenty of post-war and modern houses and bungalows elsewhere. A building warrant is needed before work starts.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Questions people ask about orangery extensions
Will my neighbours in Bonnyrigg be involved?
If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.
Who do I contract with for an orangery extension in Bonnyrigg?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Bonnyrigg, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.
How much does an orangery cost?
Our guide range is about £2,350 to £4,410 per m² including VAT, so a 16 m² standard-spec orangery is typically £43,500 to £55,000 in Bonnyrigg.
Book a free site visit in Bonnyrigg
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.