Kitchen extensions in Witham: design, approvals and build
From the first sketch to final sign-off, we plan and build kitchen extensions in Witham and the surrounding Essex area.
- Guide price in WithamFrom £28,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsCM8

Covering Witham
Postcode districts we cover around Witham include CM8. We also work in nearby Maldon (5 miles), Braintree (7 miles), Chelmsford (9 miles), Colchester (13 miles).
Just over the Suffolk border, Sudbury is about 17 miles away. The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.
What should I budget for a kitchen extension in Witham?
For Witham we adjust our national guide rates by ×1.06, the factor we use for East of England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Witham: £1,910 to £3,710 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £28,500 – £33,500 | £33,000 – £42,500 | £42,000 – £56,000 |
| 4 m × 5 m 20 m² | £38,000 – £45,000 | £44,500 – £56,500 | £56,000 – £74,500 |
| 4 m × 7 m 28 m² | £53,000 – £62,500 | £62,000 – £79,000 | £78,500 – £104,000 |
Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.
Want a range for your exact size? The guide-price tool takes about a minute.
Is a kitchen extension right for your house?
- Families who want cooking, dining and living together
- Homes being prepared for sale or a long-term stay
- Small or closed-off kitchens
We start with the working triangle and the island, then set the doors, glazing and roof lights around it. Getting this order right avoids the classic mistakes: a sink against a blank wall, glare on the hob or a fridge blocking the garden view.
Planning rules that apply in Witham
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Kitchen extension questions answered
Do you cover all of Witham?
Yes. We cover Witham and the surrounding parts of Essex. Site visits are free and there is no obligation.
Will my neighbours in Witham be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does a kitchen extension take to build in Witham?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Where should the island go?
Usually under the brightest part of the roof and away from the main walkway to the garden. We test two or three layouts on the plan before deciding.
How much does a kitchen extension cost?
For the extension itself our guide range is about £1,910 to £3,710 per m² including VAT. A standard 20 m² kitchen extension is typically around £44,500 to £56,500 in Witham, plus the kitchen itself, which commonly adds £9,000 to £20,000 for a mid-range design.
Book a free site visit in Witham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.