Kitchen extensions for homes in Northampton

A kitchen extension in Northampton starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in NorthamptonFrom £25,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsNN1, NN2, NN3, NN4, NN5
Kitchen extension with a navy island, flat rooflights and sliding doors to the garden

What we take care of

  • Drainage and services designed for sinks, island and appliances
  • Wide sliding or bifold doors to the garden
  • Roof lantern or rooflights positioned over the work zones
  • Kitchen-led layout planning before the drawings are fixed
  • Kitchen fitting by our team or coordination with your supplier

Working in Northampton

Our survey diary covers Northampton, including NN1, NN2, NN3, NN4, NN5, NN7. Neighbouring towns we cover include Wellingborough (9 miles), Towcester (10 miles), Daventry (12 miles), Rushden (12 miles).

Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.

What should I budget for a kitchen extension in Northampton?

These guide figures apply our East Midlands adjustment (×0.95) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Northampton: £1,710 to £3,320 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£25,500 – £30,000£29,500 – £38,000£37,500 – £50,000
4 m × 5 m
20 m²
£34,000 – £40,000£39,500 – £50,500£50,000 – £66,500
4 m × 7 m
28 m²
£47,500 – £56,000£55,500 – £70,500£70,000 – £93,500

Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.

Want a range for your exact size? The guide-price tool takes about a minute.

Do I need planning permission in Northampton?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

The planning position for a specific Northampton address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Northampton home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Kitchen extension questions answered

Will my neighbours in Northampton be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does a kitchen extension take to build in Northampton?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Do I need building regulations approval in Northampton?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How much does a kitchen extension cost?

For the extension itself our guide range is about £1,710 to £3,320 per m² including VAT. A standard 20 m² kitchen extension is typically around £39,500 to £50,500 in Northampton, plus the kitchen itself, which commonly adds £9,000 to £20,000 for a mid-range design.

Where should the island go?

Usually under the brightest part of the roof and away from the main walkway to the garden. We test two or three layouts on the plan before deciding.

Book a free site visit in Northampton

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote