Kitchen extensions in Letchworth Garden City
We design and build kitchen extensions for houses in Letchworth Garden City, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in Letchworth Garden CityFrom £28,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsSG6

Kitchen extension prices in Letchworth Garden City
Prices below are for Letchworth Garden City, using the East of England factor of ×1.06. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Letchworth Garden City: £1,910 to £3,710 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £28,500 – £33,500 | £33,000 – £42,500 | £42,000 – £56,000 |
| 4 m × 5 m 20 m² | £38,000 – £45,000 | £44,500 – £56,500 | £56,000 – £74,500 |
| 4 m × 7 m 28 m² | £53,000 – £62,500 | £62,000 – £79,000 | £78,500 – £104,000 |
Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.
Want a range for your exact size? The guide-price tool takes about a minute.
Covering Letchworth Garden City
Our survey diary covers Letchworth Garden City, including SG6. Neighbouring towns we cover include Hitchin (3 miles), Stevenage (5 miles), Welwyn Garden City (12 miles), Harpenden (13 miles).
Just over the Bedfordshire border, Luton is about 11 miles away. The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.
Will the council need to approve it?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Who a kitchen extension suits
- Homes being prepared for sale or a long-term stay
- Families who want cooking, dining and living together
- Small or closed-off kitchens
We start with the working triangle and the island, then set the doors, glazing and roof lights around it. Getting this order right avoids the classic mistakes: a sink against a blank wall, glare on the hob or a fridge blocking the garden view.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about kitchen extensions
How long does a kitchen extension take to build in Letchworth Garden City?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Will my neighbours in Letchworth Garden City be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Letchworth Garden City?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Where should the island go?
Usually under the brightest part of the roof and away from the main walkway to the garden. We test two or three layouts on the plan before deciding.
Can you fit a kitchen I buy elsewhere?
Yes. We can fit it or work with your supplier’s fitters. We need the layout early so that drains, services and lighting are in the right place.
Book a free site visit in Letchworth Garden City
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end