house-extension.uk

Chingford kitchen extensions, designed and built

From the first sketch to final sign-off, we plan and build kitchen extensions in Chingford and the surrounding Greater London area.

  • Guide price in ChingfordFrom £35,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsE4, E18, EN3, IG8, N9
Kitchen extension with a navy island, flat rooflights and sliding doors to the garden

Guide prices for Chingford

These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Chingford: £2,340 to £4,550 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£35,000 – £41,000£40,500 – £52,000£51,500 – £68,500
4 m × 5 m
20 m²
£46,500 – £55,000£54,500 – £69,000£68,500 – £91,000
4 m × 7 m
28 m²
£65,500 – £76,500£76,000 – £96,500£96,000 – £127,500

Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.

For a figure based on your own dimensions, use our guide-price tool.

Is a kitchen extension right for your house?

  • Small or closed-off kitchens
  • Families who want cooking, dining and living together
  • Homes being prepared for sale or a long-term stay

We start with the working triangle and the island, then set the doors, glazing and roof lights around it. Getting this order right avoids the classic mistakes: a sink against a blank wall, glare on the hob or a fridge blocking the garden view.

Will the council need to approve it?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Covering Chingford

Across E4, E18, EN3, IG8, N9, N18, we can visit, measure and advise. Neighbouring towns we cover include Woodford Green (2 miles), Ponders End (2 miles), Edmonton (3 miles), Walthamstow (3 miles).

Just over the Essex border, Waltham Abbey is about 4 miles away. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions people ask about kitchen extensions

Do I need building regulations approval in Chingford?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who do I contract with for a kitchen extension in Chingford?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a kitchen extension take to build in Chingford?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Where should the island go?

Usually under the brightest part of the roof and away from the main walkway to the garden. We test two or three layouts on the plan before deciding.

Can you fit a kitchen I buy elsewhere?

Yes. We can fit it or work with your supplier’s fitters. We need the layout early so that drains, services and lighting are in the right place.

Book a free site visit in Chingford

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote