house-extension.uk

Kitchen extensions for homes in Bordon

Thinking about a kitchen extension for your Bordon home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.

  • Guide price in BordonFrom £30,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsGU35
Kitchen extension with a navy island, flat rooflights and sliding doors to the garden

Covering Bordon

Postcode districts we cover around Bordon include GU35. Neighbouring towns we cover include Alton (5 miles), Aldershot (10 miles), Fleet (12 miles), Farnborough (13 miles).

The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

Planning and approvals in Bordon

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

The planning position for a specific Bordon address depends on its history and any designations, which is why we check it at the first visit.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

What should I budget for a kitchen extension in Bordon?

For Bordon we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Bordon: £2,020 to £3,920 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£30,000 – £35,500£35,000 – £45,000£44,500 – £59,000
4 m × 5 m
20 m²
£40,000 – £47,500£47,000 – £59,500£59,000 – £78,500
4 m × 7 m
28 m²
£56,000 – £66,000£65,500 – £83,500£83,000 – £110,000

Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.

Want a range for your exact size? The guide-price tool takes about a minute.

Is a kitchen extension right for your house?

  • Homes being prepared for sale or a long-term stay
  • Families who want cooking, dining and living together
  • Small or closed-off kitchens

We start with the working triangle and the island, then set the doors, glazing and roof lights around it. Getting this order right avoids the classic mistakes: a sink against a blank wall, glare on the hob or a fridge blocking the garden view.

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Bordon

Will my neighbours in Bordon be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does a kitchen extension take to build in Bordon?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Who do I contract with for a kitchen extension in Bordon?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Can you fit a kitchen I buy elsewhere?

Yes. We can fit it or work with your supplier’s fitters. We need the layout early so that drains, services and lighting are in the right place.

Where should the island go?

Usually under the brightest part of the roof and away from the main walkway to the garden. We test two or three layouts on the plan before deciding.

Book a free site visit in Bordon

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote