Kitchen extensions for homes in Bishop Auckland
Thinking about a kitchen extension for your Bishop Auckland home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide price in Bishop AucklandFrom £24,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsDL4, DL14

When a kitchen extension makes sense
- Homes being prepared for sale or a long-term stay
- Families who want cooking, dining and living together
- Small or closed-off kitchens
Planning and approvals in Bishop Auckland
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Working in Bishop Auckland
We cover Bishop Auckland and the postcode districts DL4, DL14. The same team covers Newton Aycliffe (5 miles), Durham (9 miles), Darlington (10 miles), Chester-le-Street (15 miles), all within easy reach.
The North East has many brick terraces, colliery-era housing and post-war semis, with rear extensions and kitchen extensions the most common requests.
Kitchen extension prices in Bishop Auckland
Prices below are for Bishop Auckland, using the North East England factor of ×0.91. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Bishop Auckland: £1,640 to £3,180 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £24,500 – £29,000 | £28,500 – £36,500 | £36,000 – £48,000 |
| 4 m × 5 m 20 m² | £32,500 – £38,500 | £38,000 – £48,500 | £48,000 – £64,000 |
| 4 m × 7 m 28 m² | £45,500 – £54,000 | £53,500 – £68,000 | £67,500 – £89,500 |
Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.
For a figure based on your own dimensions, use our guide-price tool.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Bishop Auckland home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Questions people ask about kitchen extensions
Will my neighbours in Bishop Auckland be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Bishop Auckland?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Bishop Auckland?
Yes. We cover Bishop Auckland and the surrounding parts of County Durham. Site visits are free and there is no obligation.
How much does a kitchen extension cost?
For the extension itself our guide range is about £1,640 to £3,180 per m² including VAT. A standard 20 m² kitchen extension is typically around £38,000 to £48,500 in Bishop Auckland, plus the kitchen itself, which commonly adds £9,000 to £20,000 for a mid-range design.
Can you fit a kitchen I buy elsewhere?
Yes. We can fit it or work with your supplier’s fitters. We need the layout early so that drains, services and lighting are in the right place.
Book a free site visit in Bishop Auckland
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end