Home office extensions for homes in Kilburn
Planning a home office extension in Kilburn? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in KilburnFrom £20,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–12 weeks on site
- Postcode districtsNW2, NW3, NW6, NW8, NW11

Guide prices for Kilburn
These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Kilburn: £2,400 to £4,420 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2.5 m × 3.2 m 8 m² | £20,500 – £25,000 | £22,000 – £28,500 | £28,000 – £35,500 |
| 3 m × 3.6 m 11 m² | £26,000 – £31,500 | £30,500 – £39,000 | £38,500 – £49,000 |
| 3 m × 5 m 15 m² | £36,000 – £43,000 | £41,500 – £53,000 | £52,500 – £66,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Local to Kilburn
We cover Kilburn and the postcode districts NW2, NW3, NW6, NW8, NW11, W9. Neighbouring towns we cover include Cricklewood (1 mile), Golders Green (2 miles), Chalk Farm (2 miles), Camden Town (2 miles).
London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.
Planning rules that apply in Kilburn
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What we take care of
- Layout for desk, storage and video calls
- Window and rooflight placement to avoid screen glare
- Heating or cooling sized for the room
- Data cabling and plenty of sockets
North-facing glass and rooflights give steadier light for screen work. Where the office faces south, we use deeper reveals or external shading to keep glare and heat down.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Your questions about a home office extension in Kilburn
Do I need building regulations approval in Kilburn?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Kilburn, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a home office extension take to build in Kilburn?
On site, typically 8 to 12 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
Can I claim the cost against tax?
Building work on your home is not normally an allowable business expense, and claiming it can have capital gains tax effects. Speak to an accountant before assuming any tax relief.
Is an attached office better than a garden office?
An attached office shares the house heating and broadband, adds floor area to the home, and needs no garden path in the rain. A garden building can be cheaper and quicker but is a separate structure.
Book a free site visit in Kilburn
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.