How do I plan a house extension, step by step?

Plan an extension in seven steps: set a budget with a contingency, get a measured survey, agree the design, confirm the planning route, prepare building regulations and structural drawings, serve any party wall notices, then fix the build price and programme. Most projects take 2 to 4 months before work starts.

1. Set the budget and the brief

Decide what the extension must do and what you can spend, including a contingency of about 10%. Use our guide-price tool to check the size you want against the budget.

2. Survey and design

A measured survey records your house accurately. From it, two or three layout options are drawn so you can compare space, light and cost before choosing one.

3. Confirm the planning route

Permitted development, prior approval in England, or a householder application. Check conservation area status, Article 4 directions and earlier extensions first.

4. Building regulations and structure

Building regulations drawings, a specification and structural calculations turn the design into something buildable and approvable.

5. Neighbours and party walls

Talk to your neighbours early. In England and Wales serve party wall notices where the Act applies.

6. Fix the price and programme

With approved drawings, the build can be priced in writing and scheduled, including lead times for steel, glazing and kitchens.

7. Build, inspect and sign off

Building control inspects at key stages. At the end you receive the completion certificate, and any guarantees for windows, roofs and appliances from the manufacturers.

This guide is general information, not legal or professional advice for your property. Rules can change; we check the current position for your address at the survey.

Talk to us about your extension

Book a free site visit: we measure up, check the planning route and give honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote