Glass box extensions across Maidstone
If you live in Maidstone and want more space without moving, a glass extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in MaidstoneFrom £33,500 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsME14, ME15, ME16, ME17, ME18

When a glass extension makes sense
- Small infill spaces and side returns
- Period and listed-style houses where a light touch is wanted
- Garden-facing dining rooms
Solar gain is the risk. We specify solar-control glass, plan for opening vents or sliding panels, and avoid fully glazed roofs on south-facing extensions unless shading is included.
Covering Maidstone
We cover Maidstone and the postcode districts ME14, ME15, ME16, ME17, ME18, ME20. We also work in nearby Chatham (8 miles), Rochester (8 miles), Gillingham (9 miles), Strood (9 miles).
For homes towards Essex, Grays is around 17 miles away. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
Guide prices for Maidstone
For Maidstone we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Maidstone: £3,360 to £6,500 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 4 m 8 m² | £33,500 – £40,500 | £33,500 – £42,500 | £38,500 – £52,000 |
| 3 m × 4 m 12 m² | £40,000 – £48,500 | £47,000 – £59,500 | £57,500 – £78,000 |
| 3 m × 6 m 18 m² | £60,000 – £73,000 | £70,500 – £89,000 | £86,500 – £117,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning and approvals in Maidstone
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Your questions about a glass extension in Maidstone
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Maidstone, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Maidstone?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Maidstone?
Yes. We cover Maidstone and the surrounding parts of Kent. Site visits are free and there is no obligation.
Are glass extensions cold in winter?
Modern double or triple glazing with warm-edge spacers and underfloor heating keeps them comfortable. They are not as warm as a solid room, and we explain the trade-off honestly.
How much does a glass extension cost?
Our guide range is about £3,360 to £6,500 per m² including VAT, because structural glass is made to order. A 12 m² standard-spec glass extension is typically £47,000 to £59,500 in Maidstone.
Book a free site visit in Maidstone
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.