house-extension.uk

Extension plans and drawings in Upper Norwood

We prepare extension plans and drawings for homes in Upper Norwood, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in Upper NorwoodFrom £1,550 inc VAT
  • PlanningWe find the right route for you
  • Timescale2–6 weeks for drawings
  • Postcode districtsCR7, SE19, SE20, SE25, SE27
Extension floor plans and elevations with a scale ruler and laser measure

Working in Upper Norwood

Postcode districts we cover around Upper Norwood include CR7, SE19, SE20, SE25, SE27, SW16. We also work in nearby Norbury (1 mile), South Norwood (1 mile), Streatham (2 miles), Croydon (2 miles).

Banstead, in Surrey, is roughly 8 miles from Upper Norwood and also on our list. London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.

Fees in Upper Norwood

Fees below are our Upper Norwood guide (×1.3, the London factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialMeasured survey and planning drawings£1,550 – £2,900
StandardPlanning drawings plus building regulations drawings£2,850 – £4,950
PremiumFull pack with structural calculations and 3D visuals£4,400 – £7,150

Try the guide-price tool to see a range for your own size and finish.

Included in a typical project

  • Building regulations drawings and specification
  • Planning drawings: existing and proposed plans and elevations, site and location plans
  • Structural calculations from an engineer (full pack)
  • Measured survey of the house and garden

Do I need planning permission in Upper Norwood?

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Common questions in Upper Norwood

Do I need building regulations approval in Upper Norwood?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Upper Norwood, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Who do I contract with in Upper Norwood?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Can I use your drawings with another builder?

Yes. Once paid for, the drawings are yours to use for your project.

Do I need an architect?

Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.

Book a free site visit in Upper Norwood

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote