house-extension.uk

Extension plans and drawings across Towcester

For Towcester homeowners we handle extension plans and drawings, with fees agreed in writing before any work starts.

  • Guide price in TowcesterFrom £1,100 inc VAT
  • PlanningWe find the right route for you
  • Timescale2–6 weeks for drawings
  • Postcode districtsNN12
Extension floor plans and elevations with a scale ruler and laser measure

Fees in Towcester

Fees below are our Towcester guide (×0.95, the East Midlands factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialMeasured survey and planning drawings£1,100 – £2,100
StandardPlanning drawings plus building regulations drawings£2,050 – £3,650
PremiumFull pack with structural calculations and 3D visuals£3,200 – £5,250

Try the guide-price tool to see a range for your own size and finish.

Extensions in and around Towcester

Postcode districts we cover around Towcester include NN12. The same team covers Brackley (9 miles), Northampton (10 miles), Daventry (11 miles), Wellingborough (18 miles), all within easy reach.

The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.

Planning and approvals in Towcester

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

What is included

  • 3D views to check the look and the light (full pack)
  • Structural calculations from an engineer (full pack)
  • Building regulations drawings and specification
  • Planning drawings: existing and proposed plans and elevations, site and location plans
  • Two or three layout options to compare
  • Measured survey of the house and garden

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions answered

How long does this take for a Towcester home?

2–6 weeks for drawings, depending on the council and the complexity of the project.

Do I need building regulations approval in Towcester?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Will my neighbours in Towcester be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do I need an architect?

Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.

Can I use your drawings with another builder?

Yes. Once paid for, the drawings are yours to use for your project.

Book a free site visit in Towcester

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote