Extension plans and drawings in Havant
For Havant homeowners we handle extension plans and drawings, with fees agreed in writing before any work starts.
- Guide price in HavantFrom £1,300 inc VAT
- PlanningWe find the right route for you
- Timescale2–6 weeks for drawings
- Postcode districtsPO7, PO9

What is included
- Building regulations drawings and specification
- Two or three layout options to compare
- Measured survey of the house and garden
- Structural calculations from an engineer (full pack)
The most expensive changes are the ones made after the steel is ordered. A good design stage settles layout, heights, glazing and services on paper, so the build price is firm.
Fees in Havant
Fees below are our Havant guide (×1.12, the South East England factor), including VAT. Council and building control fees are extra.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Measured survey and planning drawings | £1,300 – £2,500 |
| Standard | Planning drawings plus building regulations drawings | £2,450 – £4,300 |
| Premium | Full pack with structural calculations and 3D visuals | £3,800 – £6,200 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning rules that apply in Havant
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
The planning position for a specific Havant address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around Havant
Across PO7, PO9, we can visit, measure and advise. The same team covers Waterlooville (3 miles), Portsmouth (6 miles), Gosport (8 miles), Fareham (8 miles), all within easy reach.
Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Havant home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Havant
How long does this take for a Havant home?
2–6 weeks for drawings, depending on the council and the complexity of the project.
Do I need building regulations approval in Havant?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Havant be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need an architect?
Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.
Can I use your drawings with another builder?
Yes. Once paid for, the drawings are yours to use for your project.
Book a free site visit in Havant
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.