Extension plans and drawings across Earley
Need extension plans and drawings in Earley? We survey the house, prepare what the council needs and deal with the officers until a decision is made.
- Guide price in EarleyFrom £1,300 inc VAT
- PlanningWe find the right route for you
- Timescale2–6 weeks for drawings
- Postcode districtsRG2, RG5, RG6

What we take care of
- Structural calculations from an engineer (full pack)
- Measured survey of the house and garden
- Planning drawings: existing and proposed plans and elevations, site and location plans
- Two or three layout options to compare
- Building regulations drawings and specification
Will the council need to approve it?
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Design and approval fees for Earley
Guide fees for Earley including VAT, using our South East England factor of ×1.12. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Measured survey and planning drawings | £1,300 – £2,500 |
| Standard | Planning drawings plus building regulations drawings | £2,450 – £4,300 |
| Premium | Full pack with structural calculations and 3D visuals | £3,800 – £6,200 |
Want a range for your exact size? The guide-price tool takes about a minute.
Extensions in and around Earley
Site visits are available across Earley (RG2, RG5, RG6). We also work in nearby Reading (3 miles), Wokingham (4 miles), Crowthorne (7 miles), Bracknell (7 miles).
For homes towards Hampshire, Yateley is around 7 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Earley
Will my neighbours in Earley be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Earley, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Earley?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How much do extension plans cost?
Our design packs range from about £1,300 to £6,200 including VAT, from planning drawings only to a full pack with building regulations drawings, structural calculations and 3D views. Council fees are separate.
Can I use your drawings with another builder?
Yes. Once paid for, the drawings are yours to use for your project.
Book a free site visit in Earley
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.