Extension plans and drawings across Consett
We prepare extension plans and drawings for homes in Consett, as a stand-alone service or as the first stage of a design and build project.
- Guide price in ConsettFrom £1,050 inc VAT
- PlanningWe find the right route for you
- Timescale2–6 weeks for drawings
- Postcode districtsDH8

Design and approval fees for Consett
Fees below are our Consett guide (×0.91, the North East England factor), including VAT. Council and building control fees are extra.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Measured survey and planning drawings | £1,050 – £2,050 |
| Standard | Planning drawings plus building regulations drawings | £2,000 – £3,500 |
| Premium | Full pack with structural calculations and 3D visuals | £3,050 – £5,050 |
Want a range for your exact size? The guide-price tool takes about a minute.
Working in Consett
Our survey diary covers Consett, including DH8. The same team covers Stanley (5 miles), Chester-le-Street (10 miles), Durham (12 miles), Bishop Auckland (15 miles), all within easy reach.
The North East has many brick terraces, colliery-era housing and post-war semis, with rear extensions and kitchen extensions the most common requests.
Planning and approvals in Consett
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Measured survey of the house and garden
- Planning drawings: existing and proposed plans and elevations, site and location plans
- Two or three layout options to compare
- Building regulations drawings and specification
The most expensive changes are the ones made after the steel is ordered. A good design stage settles layout, heights, glazing and services on paper, so the build price is firm.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Consett home, measure up, talk through what you want and check the planning position.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions answered
How long does this take for a Consett home?
2–6 weeks for drawings, depending on the council and the complexity of the project.
Do you cover all of Consett?
Yes. We cover Consett and the surrounding parts of County Durham. Site visits are free and there is no obligation.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Consett, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How much do extension plans cost?
Our design packs range from about £1,050 to £5,050 including VAT, from planning drawings only to a full pack with building regulations drawings, structural calculations and 3D views. Council fees are separate.
Do I need an architect?
Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.
Book a free site visit in Consett
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .