Extension plans and drawings in Broadstairs
For Broadstairs homeowners we handle extension plans and drawings, with fees agreed in writing before any work starts.
- Guide price in BroadstairsFrom £1,300 inc VAT
- PlanningWe find the right route for you
- Timescale2–6 weeks for drawings
- Postcode districtsCT10, CT11

Design and approval fees for Broadstairs
These are guide fees for Broadstairs, adjusted for South East England (×1.12) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Measured survey and planning drawings | £1,300 – £2,500 |
| Standard | Planning drawings plus building regulations drawings | £2,450 – £4,300 |
| Premium | Full pack with structural calculations and 3D visuals | £3,800 – £6,200 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning rules that apply in Broadstairs
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Two or three layout options to compare
- Structural calculations from an engineer (full pack)
- Planning drawings: existing and proposed plans and elevations, site and location plans
- Measured survey of the house and garden
- 3D views to check the look and the light (full pack)
The most expensive changes are the ones made after the steel is ordered. A good design stage settles layout, heights, glazing and services on paper, so the build price is firm.
Local to Broadstairs
We cover Broadstairs and the postcode districts CT10, CT11. Nearby, we also take on projects in Ramsgate (2 miles), Margate (3 miles), Deal (9 miles), Herne Bay (14 miles).
For homes towards Essex, Clacton-on-Sea is around 32 miles away. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Broadstairs
Do I need building regulations approval in Broadstairs?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does this take for a Broadstairs home?
2–6 weeks for drawings, depending on the council and the complexity of the project.
Will my neighbours in Broadstairs be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How much do extension plans cost?
Our design packs range from about £1,300 to £6,200 including VAT, from planning drawings only to a full pack with building regulations drawings, structural calculations and 3D views. Council fees are separate.
Can I use your drawings with another builder?
Yes. Once paid for, the drawings are yours to use for your project.
Book a free site visit in Broadstairs
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.