house-extension.uk

Extension plans and drawings across Bolton

For Bolton homeowners we handle extension plans and drawings, with fees agreed in writing before any work starts.

  • Guide price in BoltonFrom £1,100 inc VAT
  • PlanningWe find the right route for you
  • Timescale2–6 weeks for drawings
  • Postcode districtsBL1, BL2, BL3, BL4, BL7
Extension floor plans and elevations with a scale ruler and laser measure

Extensions in and around Bolton

We cover Bolton and the postcode districts BL1, BL2, BL3, BL4, BL7, M38. We also work in nearby Farnworth (3 miles), Westhoughton (4 miles), Radcliffe (5 miles), Atherton (5 miles).

Just over the Lancashire border, Darwen is about 8 miles away. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.

Who this service is for

  • Anyone who wants fixed designs before getting build prices
  • Projects that need a planning application or other approval
  • Homeowners at the very start of a project

The most expensive changes are the ones made after the steel is ordered. A good design stage settles layout, heights, glazing and services on paper, so the build price is firm.

Design and approval fees for Bolton

These are guide fees for Bolton, adjusted for North West England (×0.95) and including VAT. Council application and inspection fees are paid separately.

OptionWhat it coversGuide price
EssentialMeasured survey and planning drawings£1,100 – £2,100
StandardPlanning drawings plus building regulations drawings£2,050 – £3,650
PremiumFull pack with structural calculations and 3D visuals£3,200 – £5,250

Try the guide-price tool to see a range for your own size and finish.

Planning rules that apply in Bolton

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Bolton home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Common questions in Bolton

Who do I contract with in Bolton?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Will my neighbours in Bolton be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does this take for a Bolton home?

2–6 weeks for drawings, depending on the council and the complexity of the project.

Do I need an architect?

Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.

Can I use your drawings with another builder?

Yes. Once paid for, the drawings are yours to use for your project.

Book a free site visit in Bolton

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote