Extension plans and drawings in Bexley
We prepare extension plans and drawings for homes in Bexley, as a stand-alone service or as the first stage of a design and build project.
- Guide price in BexleyFrom £1,550 inc VAT
- PlanningWe find the right route for you
- Timescale2–6 weeks for drawings
- Postcode districtsDA5, DA6, DA7, DA14, DA15

When it helps
- Projects that need a planning application or other approval
- Anyone who wants fixed designs before getting build prices
- Homeowners at the very start of a project
The most expensive changes are the ones made after the steel is ordered. A good design stage settles layout, heights, glazing and services on paper, so the build price is firm.
Working in Bexley
Site visits are available across Bexley (DA5, DA6, DA7, DA14, DA15, DA16). We also work in nearby Welling (2 miles), Abbey Wood (4 miles), Chislehurst (4 miles), Plumstead (4 miles).
Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
What it costs in Bexley
Guide fees for Bexley including VAT, using our London factor of ×1.3. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Measured survey and planning drawings | £1,550 – £2,900 |
| Standard | Planning drawings plus building regulations drawings | £2,850 – £4,950 |
| Premium | Full pack with structural calculations and 3D visuals | £4,400 – £7,150 |
For a figure based on your own dimensions, use our guide-price tool.
Planning rules that apply in Bexley
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
The planning position for a specific Bexley address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in Bexley
Will my neighbours in Bexley be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Bexley?
Yes. We cover Bexley and the surrounding parts of Greater London. Site visits are free and there is no obligation.
How long does this take for a Bexley home?
2–6 weeks for drawings, depending on the council and the complexity of the project.
Do I need an architect?
Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.
How much do extension plans cost?
Our design packs range from about £1,550 to £7,150 including VAT, from planning drawings only to a full pack with building regulations drawings, structural calculations and 3D views. Council fees are separate.
Book a free site visit in Bexley
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end