house-extension.uk

Extension plans and drawings in Becontree

We prepare extension plans and drawings for homes in Becontree, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in BecontreeFrom £1,550 inc VAT
  • PlanningWe find the right route for you
  • Timescale2–6 weeks for drawings
  • Postcode districtsE20, IG3, RM6, RM8, RM9
Extension floor plans and elevations with a scale ruler and laser measure

Extensions in and around Becontree

Our survey diary covers Becontree, including E20, IG3, RM6, RM8, RM9, RM10. The same team covers Dagenham (2 miles), Barking (2 miles), Ilford (2 miles), Romford (3 miles), all within easy reach.

South Ockendon, in Essex, is roughly 7 miles from Becontree and also on our list. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.

Included in a typical project

  • Two or three layout options to compare
  • Measured survey of the house and garden
  • Building regulations drawings and specification
  • Structural calculations from an engineer (full pack)

What it costs in Becontree

These are guide fees for Becontree, adjusted for London (×1.3) and including VAT. Council application and inspection fees are paid separately.

OptionWhat it coversGuide price
EssentialMeasured survey and planning drawings£1,550 – £2,900
StandardPlanning drawings plus building regulations drawings£2,850 – £4,950
PremiumFull pack with structural calculations and 3D visuals£4,400 – £7,150

Want a range for your exact size? The guide-price tool takes about a minute.

Do I need planning permission in Becontree?

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions answered

Do you cover all of Becontree?

Yes. We cover Becontree and the surrounding parts of Greater London. Site visits are free and there is no obligation.

Who do I contract with in Becontree?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do I need building regulations approval in Becontree?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How much do extension plans cost?

Our design packs range from about £1,550 to £7,150 including VAT, from planning drawings only to a full pack with building regulations drawings, structural calculations and 3D views. Council fees are separate.

Do I need an architect?

Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.

Book a free site visit in Becontree

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote