house-extension.uk

Planning permission for extensions across Weymouth

Need planning permission for extensions in Weymouth? We survey the house, prepare what the council needs and deal with the officers until a decision is made.

  • Guide price in WeymouthFrom £350 inc VAT
  • PlanningWe find the right route for you
  • Timescale8–13 weeks typical decision period
  • Postcode districtsDT3, DT4
Homeowners reviewing extension elevation drawings and a 3D view on a tablet

Local to Weymouth

We cover Weymouth and the postcode districts DT3, DT4. The same team covers Dorchester (7 miles), Bridport (16 miles), Swanage (22 miles), Poole (22 miles), all within easy reach.

South West homes range from terraced streets in the cities to stone cottages and bungalows in the countryside, and conservation areas are common in historic centres.

Design and approval fees for Weymouth

These are guide fees for Weymouth, adjusted for South West England (×1.02) and including VAT. Council application and inspection fees are paid separately.

OptionWhat it coversGuide price
EssentialPermitted development confirmed in writing (certificate or notification)£350 – £700
StandardHouseholder planning application handled£600 – £1,150
PremiumApplication with heritage or design statements, and responses to the council£900 – £1,650

Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.

Want a range for your exact size? The guide-price tool takes about a minute.

Included in a typical project

  • Advice if conditions are attached or changes are requested
  • Planning history and constraints check for your address
  • Submission and fee payment guidance
  • Application forms, plans and supporting statements
  • Liaison with the planning officer

Do I need planning permission in Weymouth?

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Weymouth home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions answered

Do I need building regulations approval in Weymouth?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Will my neighbours in Weymouth be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do you cover all of Weymouth?

Yes. We cover Weymouth and the surrounding parts of Dorset. Site visits are free and there is no obligation.

What happens if planning is refused?

You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.

How much does planning permission cost?

In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.

Book a free site visit in Weymouth

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote