Planning permission for extensions across Stockport

Need planning permission for extensions in Stockport? We survey the house, prepare what the council needs and deal with the officers until a decision is made.

  • Guide price in StockportFrom £300 inc VAT
  • PlanningWe find the right route for you
  • Timescale8–13 weeks typical decision period
  • Postcode districtsM19, SK1, SK2, SK3, SK4
Homeowners reviewing extension elevation drawings and a 3D view on a tablet

Planning rules that apply in Stockport

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

The planning position for a specific Stockport address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Local to Stockport

Postcode districts we cover around Stockport include M19, SK1, SK2, SK3, SK4, SK5. The same team covers Hazel Grove (2 miles), Cheadle Hulme (3 miles), Denton (4 miles), Hyde (4 miles), all within easy reach.

Just over the Cheshire border, Wilmslow is about 6 miles away. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.

Design and approval fees for Stockport

Fees below are our Stockport guide (×0.95, the North West England factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialPermitted development confirmed in writing (certificate or notification)£300 – £650
StandardHouseholder planning application handled£550 – £1,050
PremiumApplication with heritage or design statements, and responses to the council£850 – £1,550

Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.

For a figure based on your own dimensions, use our guide-price tool.

Who this service is for

  • Projects in conservation areas or with previous refusals
  • Anyone unsure whether their extension needs permission
  • Homeowners who would rather not deal with the council themselves

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions answered

How long does this take for a Stockport home?

8–13 weeks typical decision period, depending on the council and the complexity of the project.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Stockport, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Will my neighbours in Stockport be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How much does planning permission cost?

In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.

What happens if planning is refused?

You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.

Book a free site visit in Stockport

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote