Planning permission for extensions across Sale
We prepare planning permission for extensions for homes in Sale, as a stand-alone service or as the first stage of a design and build project.
- Guide price in SaleFrom £300 inc VAT
- PlanningWe find the right route for you
- Timescale8–13 weeks typical decision period
- Postcode districtsM21, M23, M32, M33, M41

What is included
- Planning history and constraints check for your address
- Advice if conditions are attached or changes are requested
- Liaison with the planning officer
- Route recommendation in writing
- Application forms, plans and supporting statements
- Submission and fee payment guidance
Fees in Sale
Guide fees for Sale including VAT, using our North West England factor of ×0.95. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Permitted development confirmed in writing (certificate or notification) | £300 – £650 |
| Standard | Householder planning application handled | £550 – £1,050 |
| Premium | Application with heritage or design statements, and responses to the council | £850 – £1,550 |
Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.
For a figure based on your own dimensions, use our guide-price tool.
Working in Sale
We cover Sale and the postcode districts M21, M23, M32, M33, M41, WA15. Nearby, we also take on projects in Stretford (2 miles), Urmston (2 miles), Altrincham (3 miles), Eccles (4 miles).
The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.
Planning rules that apply in Sale
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Sale home, measure up, talk through what you want and check the planning position.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions answered
Do I need building regulations approval in Sale?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who do I contract with in Sale?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Sale, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
What happens if planning is refused?
You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.
How much does planning permission cost?
In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.
Book a free site visit in Sale
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.