Planning permission for extensions in Rugby
We prepare planning permission for extensions for homes in Rugby, as a stand-alone service or as the first stage of a design and build project.
- Guide price in RugbyFrom £300 inc VAT
- PlanningWe find the right route for you
- Timescale8–13 weeks typical decision period
- Postcode districtsCV21, CV22, CV23

Who this service is for
- Anyone unsure whether their extension needs permission
- Homeowners who would rather not deal with the council themselves
- Projects in conservation areas or with previous refusals
Covering Rugby
Our survey diary covers Rugby, including CV21, CV22, CV23. Neighbouring towns we cover include Bedworth (11 miles), Leamington Spa (12 miles), Nuneaton (14 miles), Kenilworth (14 miles).
For homes towards Northamptonshire, Daventry is around 9 miles away. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.
Design and approval fees for Rugby
These are guide fees for Rugby, adjusted for West Midlands (×0.97) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Permitted development confirmed in writing (certificate or notification) | £300 – £650 |
| Standard | Householder planning application handled | £550 – £1,100 |
| Premium | Application with heritage or design statements, and responses to the council | £850 – £1,600 |
Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.
Try the guide-price tool to see a range for your own size and finish.
Will the council need to approve it?
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
The planning position for a specific Rugby address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Rugby
How long does this take for a Rugby home?
8–13 weeks typical decision period, depending on the council and the complexity of the project.
Do you cover all of Rugby?
Yes. We cover Rugby and the surrounding parts of Warwickshire. Site visits are free and there is no obligation.
Who do I contract with in Rugby?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
What happens if planning is refused?
You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.
How much does planning permission cost?
In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.
Book a free site visit in Rugby
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.