house-extension.uk

Planning permission for extensions across Ross-on-Wye

We prepare planning permission for extensions for homes in Ross-on-Wye, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in Ross-on-WyeFrom £300 inc VAT
  • PlanningWe find the right route for you
  • Timescale8–13 weeks typical decision period
  • Postcode districtsHR9
Homeowners reviewing extension elevation drawings and a 3D view on a tablet

Extensions in and around Ross-on-Wye

Postcode districts we cover around Ross-on-Wye include HR9. We also work in nearby Ledbury (11 miles), Hereford (12 miles), Leominster (24 miles).

The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

When it helps

  • Projects in conservation areas or with previous refusals
  • Homeowners who would rather not deal with the council themselves
  • Anyone unsure whether their extension needs permission

Do I need planning permission in Ross-on-Wye?

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

The planning position for a specific Ross-on-Wye address depends on its history and any designations, which is why we check it at the first visit.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What it costs in Ross-on-Wye

Guide fees for Ross-on-Wye including VAT, using our West Midlands factor of ×0.97. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialPermitted development confirmed in writing (certificate or notification)£300 – £650
StandardHouseholder planning application handled£550 – £1,100
PremiumApplication with heritage or design statements, and responses to the council£850 – £1,600

Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.

Want a range for your exact size? The guide-price tool takes about a minute.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Ross-on-Wye home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Common questions in Ross-on-Wye

How long does this take for a Ross-on-Wye home?

8–13 weeks typical decision period, depending on the council and the complexity of the project.

Will my neighbours in Ross-on-Wye be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do I need building regulations approval in Ross-on-Wye?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How much does planning permission cost?

In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.

What happens if planning is refused?

You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.

Book a free site visit in Ross-on-Wye

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote