Planning permission for extensions across East Riding of Yorkshire
We prepare planning permission for extensions for homes across East Riding of Yorkshire, on their own or as the first stage of a full design and build project.
- Guide priceFrom £300 inc VAT
- PlanningWe find the right route for you
- Towns covered5
- Site visitFree, no obligation

Towns in East Riding of Yorkshire
Working in East Riding of Yorkshire
Towns we cover in East Riding of Yorkshire include Hull, Bridlington, Beverley, Goole, Brough. Homes across Yorkshire and the Humber range from back-to-back and through terraces to large suburban semis, and extension options vary with them.
What we take care of
- Advice if conditions are attached or changes are requested
- Submission and fee payment guidance
- Application forms, plans and supporting statements
- Route recommendation in writing
- Liaison with the planning officer
- Planning history and constraints check for your address
A lawful development certificate is not compulsory for permitted development, but it is the cleanest proof that the extension was lawful when you come to sell. We usually recommend one.
Will the council need to approve it?
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What it costs in East Riding of Yorkshire
Guide fees for East Riding of Yorkshire including VAT, using our Yorkshire and the Humber factor of ×0.94. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Permitted development confirmed in writing (certificate or notification) | £300 – £650 |
| Standard | Householder planning application handled | £550 – £1,050 |
| Premium | Application with heritage or design statements, and responses to the council | £800 – £1,550 |
Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.
For a figure based on your own dimensions, use our guide-price tool.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in East Riding of Yorkshire
How long does this take for a East Riding of Yorkshire home?
8–13 weeks typical decision period, depending on the council and the complexity of the project.
Do you cover all of East Riding of Yorkshire?
Yes, across the whole of East Riding of Yorkshire. Site visits are free and there is no obligation.
Do I need building regulations approval in East Riding of Yorkshire?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
What happens if planning is refused?
You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.
How much does planning permission cost?
In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.
Book a free site visit in East Riding of Yorkshire
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.