house-extension.uk

Planning permission for extensions across Dronfield

We prepare planning permission for extensions for homes in Dronfield, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in DronfieldFrom £300 inc VAT
  • PlanningWe find the right route for you
  • Timescale8–13 weeks typical decision period
  • Postcode districtsS18
Homeowners reviewing extension elevation drawings and a 3D view on a tablet

Design and approval fees for Dronfield

These are guide fees for Dronfield, adjusted for East Midlands (×0.95) and including VAT. Council application and inspection fees are paid separately.

OptionWhat it coversGuide price
EssentialPermitted development confirmed in writing (certificate or notification)£300 – £650
StandardHouseholder planning application handled£550 – £1,050
PremiumApplication with heritage or design statements, and responses to the council£850 – £1,550

Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.

For a figure based on your own dimensions, use our guide-price tool.

Do I need planning permission in Dronfield?

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Local to Dronfield

Across S18, we can visit, measure and advise. Neighbouring towns we cover include Chesterfield (4 miles), Staveley (6 miles), Alfreton (15 miles), Buxton (18 miles).

Sheffield, in South Yorkshire, is roughly 6 miles from Dronfield and also on our list. The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.

What is included

  • Route recommendation in writing
  • Application forms, plans and supporting statements
  • Advice if conditions are attached or changes are requested
  • Liaison with the planning officer
  • Submission and fee payment guidance

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions answered

Do I need building regulations approval in Dronfield?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Do you cover all of Dronfield?

Yes. We cover Dronfield and the surrounding parts of Derbyshire. Site visits are free and there is no obligation.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Dronfield, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

What happens if planning is refused?

You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.

How much does planning permission cost?

In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.

Book a free site visit in Dronfield

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote