house-extension.uk

Planning permission for extensions in Doncaster

We prepare planning permission for extensions for homes in Doncaster, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in DoncasterFrom £300 inc VAT
  • PlanningWe find the right route for you
  • Timescale8–13 weeks typical decision period
  • Postcode districtsDN1, DN2, DN3, DN4, DN5
Homeowners reviewing extension elevation drawings and a 3D view on a tablet

Covering Doncaster

Postcode districts we cover around Doncaster include DN1, DN2, DN3, DN4, DN5, DN12. The same team covers Adwick le Street (4 miles), Rawmarsh (10 miles), Dinnington (11 miles), Rotherham (11 miles), all within easy reach.

For homes towards West Yorkshire, South Elmsall is around 8 miles away. Homes across Yorkshire and the Humber range from back-to-back and through terraces to large suburban semis, and extension options vary with them.

What it costs in Doncaster

Fees below are our Doncaster guide (×0.94, the Yorkshire and the Humber factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialPermitted development confirmed in writing (certificate or notification)£300 – £650
StandardHouseholder planning application handled£550 – £1,050
PremiumApplication with heritage or design statements, and responses to the council£800 – £1,550

Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.

Try the guide-price tool to see a range for your own size and finish.

Will the council need to approve it?

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What we take care of

  • Route recommendation in writing
  • Submission and fee payment guidance
  • Planning history and constraints check for your address
  • Advice if conditions are attached or changes are requested

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions answered

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Doncaster, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does this take for a Doncaster home?

8–13 weeks typical decision period, depending on the council and the complexity of the project.

Do I need building regulations approval in Doncaster?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How much does planning permission cost?

In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.

What happens if planning is refused?

You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.

Book a free site visit in Doncaster

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote