Planning permission for extensions in Cheltenham
We prepare planning permission for extensions for homes in Cheltenham, as a stand-alone service or as the first stage of a design and build project.
- Guide price in CheltenhamFrom £350 inc VAT
- PlanningWe find the right route for you
- Timescale8–13 weeks typical decision period
- Postcode districtsGL3, GL50, GL51, GL52, GL53

Local to Cheltenham
Site visits are available across Cheltenham (GL3, GL50, GL51, GL52, GL53). The same team covers Tewkesbury (7 miles), Gloucester (7 miles), Stroud (12 miles), Cirencester (13 miles), all within easy reach.
Just over the Worcestershire border, Evesham is about 14 miles away. In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.
Will the council need to approve it?
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
The planning position for a specific Cheltenham address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Who this service is for
- Projects in conservation areas or with previous refusals
- Anyone unsure whether their extension needs permission
- Homeowners who would rather not deal with the council themselves
Design and approval fees for Cheltenham
These are guide fees for Cheltenham, adjusted for South West England (×1.02) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Permitted development confirmed in writing (certificate or notification) | £350 – £700 |
| Standard | Householder planning application handled | £600 – £1,150 |
| Premium | Application with heritage or design statements, and responses to the council | £900 – £1,650 |
Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.
Try the guide-price tool to see a range for your own size and finish.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Cheltenham
How long does this take for a Cheltenham home?
8–13 weeks typical decision period, depending on the council and the complexity of the project.
Do I need building regulations approval in Cheltenham?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Cheltenham, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How much does planning permission cost?
In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.
What happens if planning is refused?
You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.
Book a free site visit in Cheltenham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.