house-extension.uk

Building regulations for extensions across Worcestershire

We prepare building regulations for extensions for homes across Worcestershire, on their own or as the first stage of a full design and build project.

  • Guide priceFrom £850 inc VAT
  • Approval routeFull plans or building notice
  • Towns covered8
  • Site visitFree, no obligation
Builder installing a steel beam over a new rear opening on acrow props

Will the council need to approve it?

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Fees in Worcestershire

These are guide fees for Worcestershire, adjusted for West Midlands (×0.97) and including VAT. Council application and inspection fees are paid separately.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£850 – £1,750
StandardDrawings plus structural calculations£1,250 – £2,550
PremiumComplex or two-storey pack with energy calculations£2,100 – £3,700

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

For a figure based on your own dimensions, use our guide-price tool.

Working in Worcestershire

Towns we cover in Worcestershire include Worcester, Redditch, Kidderminster, Malvern, Bromsgrove, Evesham, Droitwich Spa, Stourport-on-Severn. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

When it helps

  • Homeowners using their own builder who need the drawings
  • Every extension, whatever the planning route
  • Glass-heavy designs that need energy calculations

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Worcestershire

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Worcestershire, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does this take for a Worcestershire home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Do I need building regulations approval in Worcestershire?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

What are the insulation standards for an extension?

In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Book a free site visit in Worcestershire

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote