house-extension.uk

Building regulations for extensions in Telford

For Telford homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.

  • Guide price in TelfordFrom £850 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsTF1, TF2, TF3, TF4, TF7
Builder installing a steel beam over a new rear opening on acrow props

Extensions in and around Telford

Postcode districts we cover around Telford include TF1, TF2, TF3, TF4, TF7, TF8. The same team covers Wellington (3 miles), Bridgnorth (11 miles), Shrewsbury (13 miles), Market Drayton (15 miles), all within easy reach.

Just over the West Midlands border, Wolverhampton is about 15 miles away. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

What it costs in Telford

Guide fees for Telford including VAT, using our West Midlands factor of ×0.97. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£850 – £1,750
StandardDrawings plus structural calculations£1,250 – £2,550
PremiumComplex or two-storey pack with energy calculations£2,100 – £3,700

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

For a figure based on your own dimensions, use our guide-price tool.

When it helps

  • Glass-heavy designs that need energy calculations
  • Every extension, whatever the planning route
  • Homeowners using their own builder who need the drawings

Planning and approvals in Telford

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

The planning position for a specific Telford address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Telford home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Common questions in Telford

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Telford, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does this take for a Telford home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Do I need building regulations approval in Telford?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Book a free site visit in Telford

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote