Building regulations for extensions in Staffordshire
We prepare building regulations for extensions for homes across Staffordshire, on their own or as the first stage of a full design and build project.
- Guide priceFrom £850 inc VAT
- Approval routeFull plans or building notice
- Towns covered13
- Site visitFree, no obligation

Towns in Staffordshire
Local to Staffordshire
Towns we cover in Staffordshire include Stoke-on-Trent, Newcastle-under-Lyme, Burton upon Trent, Cannock, Tamworth, Stafford, Lichfield, Kidsgrove. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.
Fees in Staffordshire
Fees below are our Staffordshire guide (×0.97, the West Midlands factor), including VAT. Council and building control fees are extra.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £850 – £1,750 |
| Standard | Drawings plus structural calculations | £1,250 – £2,550 |
| Premium | Complex or two-storey pack with energy calculations | £2,100 – £3,700 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Want a range for your exact size? The guide-price tool takes about a minute.
What we take care of
- Submission to the council or a registered building control approver
- Completion certificate on sign-off
- Energy and glazing checks, including whole-house calculations if needed
- Building regulations drawings and written specification
Planning and approvals in Staffordshire
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Staffordshire
Do I need building regulations approval in Staffordshire?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does this take for a Staffordshire home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Will my neighbours in Staffordshire be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Book a free site visit in Staffordshire
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.