Building regulations for extensions across Southampton
We prepare building regulations for extensions for homes in Southampton, as a stand-alone service or as the first stage of a design and build project.
- Guide price in SouthamptonFrom £1,000 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsSO14, SO15, SO16, SO17, SO18

Extensions in and around Southampton
Postcode districts we cover around Southampton include SO14, SO15, SO16, SO17, SO18, SO19. Neighbouring towns we cover include Hythe (3 miles), Totton (4 miles), Eastleigh (5 miles), Fareham (10 miles).
Just over the Isle of Wight border, Cowes is about 11 miles away. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
Design and approval fees for Southampton
Guide fees for Southampton including VAT, using our South East England factor of ×1.12. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £1,000 – £2,050 |
| Standard | Drawings plus structural calculations | £1,450 – £2,950 |
| Premium | Complex or two-storey pack with energy calculations | £2,450 – £4,300 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Try the guide-price tool to see a range for your own size and finish.
Planning rules that apply in Southampton
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Who this service is for
- Glass-heavy designs that need energy calculations
- Homeowners using their own builder who need the drawings
- Every extension, whatever the planning route
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Southampton
How long does this take for a Southampton home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Do you cover all of Southampton?
Yes. We cover Southampton and the surrounding parts of Hampshire. Site visits are free and there is no obligation.
Will my neighbours in Southampton be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Book a free site visit in Southampton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.