house-extension.uk

Building regulations for extensions across South Norwood

Need building regulations for extensions in South Norwood? We survey the house, prepare what the council needs and deal with the officers until a decision is made.

  • Guide price in South NorwoodFrom £1,150 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsCR7, SE19, SE20, SE25
Builder installing a steel beam over a new rear opening on acrow props

Planning and approvals in South Norwood

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

The planning position for a specific South Norwood address depends on its history and any designations, which is why we check it at the first visit.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Local to South Norwood

Our survey diary covers South Norwood, including CR7, SE19, SE20, SE25. We also work in nearby Upper Norwood (1 mile), Croydon (2 miles), Norbury (2 miles), Beckenham (2 miles).

For homes towards Surrey, Banstead is around 8 miles away. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.

Design and approval fees for South Norwood

Fees below are our South Norwood guide (×1.3, the London factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£1,150 – £2,350
StandardDrawings plus structural calculations£1,650 – £3,400
PremiumComplex or two-storey pack with energy calculations£2,850 – £4,950

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

Try the guide-price tool to see a range for your own size and finish.

What is included

  • Energy and glazing checks, including whole-house calculations if needed
  • Structural calculations for beams, lintels and foundations
  • Completion certificate on sign-off
  • Inspection bookings throughout the build
  • Building regulations drawings and written specification
  • Submission to the council or a registered building control approver

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Common questions in South Norwood

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for South Norwood, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Will my neighbours in South Norwood be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do you cover all of South Norwood?

Yes. We cover South Norwood and the surrounding parts of Greater London. Site visits are free and there is no obligation.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Book a free site visit in South Norwood

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote