Building regulations for extensions across Scottish Borders
We prepare the building warrant for extensions for homes across Scottish Borders, on their own or as the first stage of a full design and build project.
- Guide priceFrom £850 inc VAT
- Approval routeBuilding warrant before work starts
- Towns covered4
- Site visitFree, no obligation

Towns in Scottish Borders
Planning and approvals in Scottish Borders
In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building close to a public sewer needs the agreement of Scottish Water, which we check during design.
Applications are decided by your council as planning authority.
Design and approval fees for Scottish Borders
These are guide fees for Scottish Borders, adjusted for Scotland (×0.98) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £850 – £1,800 |
| Standard | Drawings plus structural calculations | £1,250 – £2,550 |
| Premium | Complex or two-storey pack with energy calculations | £2,150 – £3,750 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Scottish Government.
Want a range for your exact size? The guide-price tool takes about a minute.
What is included
- Completion certificate on sign-off
- Inspection bookings throughout the build
- Energy and glazing checks, including whole-house calculations if needed
- Building regulations drawings and written specification
Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.
Extensions in and around Scottish Borders
Towns we cover in Scottish Borders include Galashiels, Hawick, Peebles, Kelso. Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Scottish Borders
How long does this take for a Scottish Borders home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Scottish Borders, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do you cover all of Scottish Borders?
Yes, across the whole of Scottish Borders. Site visits are free and there is no obligation.
Book a free site visit in Scottish Borders
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.