Building regulations for extensions across Nottingham
Need building regulations for extensions in Nottingham? We survey the house, prepare what the council needs and deal with the officers until a decision is made.
- Guide price in NottinghamFrom £850 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsNG1, NG2, NG3, NG4, NG7

Extensions in and around Nottingham
Site visits are available across Nottingham (NG1, NG2, NG3, NG4, NG7, NG8). Nearby, we also take on projects in West Bridgford (2 miles), Arnold (3 miles), Hucknall (6 miles), Eastwood (7 miles).
Just over the Derbyshire border, Long Eaton is about 6 miles away. The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.
Fees in Nottingham
Guide fees for Nottingham including VAT, using our East Midlands factor of ×0.95. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £850 – £1,750 |
| Standard | Drawings plus structural calculations | £1,200 – £2,500 |
| Premium | Complex or two-storey pack with energy calculations | £2,050 – £3,650 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Want a range for your exact size? The guide-price tool takes about a minute.
What we take care of
- Completion certificate on sign-off
- Building regulations drawings and written specification
- Energy and glazing checks, including whole-house calculations if needed
- Inspection bookings throughout the build
- Submission to the council or a registered building control approver
- Structural calculations for beams, lintels and foundations
Will the council need to approve it?
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions answered
How long does this take for a Nottingham home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Will my neighbours in Nottingham be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Nottingham?
Yes. We cover Nottingham and the surrounding parts of Nottinghamshire. Site visits are free and there is no obligation.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Book a free site visit in Nottingham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.