house-extension.uk

Building regulations for extensions across Nottingham

Need building regulations for extensions in Nottingham? We survey the house, prepare what the council needs and deal with the officers until a decision is made.

  • Guide price in NottinghamFrom £850 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsNG1, NG2, NG3, NG4, NG7
Builder installing a steel beam over a new rear opening on acrow props

Extensions in and around Nottingham

Site visits are available across Nottingham (NG1, NG2, NG3, NG4, NG7, NG8). Nearby, we also take on projects in West Bridgford (2 miles), Arnold (3 miles), Hucknall (6 miles), Eastwood (7 miles).

Just over the Derbyshire border, Long Eaton is about 6 miles away. The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.

Fees in Nottingham

Guide fees for Nottingham including VAT, using our East Midlands factor of ×0.95. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£850 – £1,750
StandardDrawings plus structural calculations£1,200 – £2,500
PremiumComplex or two-storey pack with energy calculations£2,050 – £3,650

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

Want a range for your exact size? The guide-price tool takes about a minute.

What we take care of

  • Completion certificate on sign-off
  • Building regulations drawings and written specification
  • Energy and glazing checks, including whole-house calculations if needed
  • Inspection bookings throughout the build
  • Submission to the council or a registered building control approver
  • Structural calculations for beams, lintels and foundations

Will the council need to approve it?

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions answered

How long does this take for a Nottingham home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Will my neighbours in Nottingham be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do you cover all of Nottingham?

Yes. We cover Nottingham and the surrounding parts of Nottinghamshire. Site visits are free and there is no obligation.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Book a free site visit in Nottingham

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote