house-extension.uk

Building regulations for extensions across New Cross

For New Cross homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.

  • Guide price in New CrossFrom £1,150 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsSE4, SE8, SE10, SE14, SE15
Builder installing a steel beam over a new rear opening on acrow props

Local to New Cross

Postcode districts we cover around New Cross include SE4, SE8, SE10, SE14, SE15, SE16. The same team covers Brockley (1 mile), Greenwich (1 mile), Peckham (1 mile), Blackheath (2 miles), all within easy reach.

Just over the Kent border, Swanley is about 11 miles away. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.

Do I need planning permission in New Cross?

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Fees in New Cross

Guide fees for New Cross including VAT, using our London factor of ×1.3. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£1,150 – £2,350
StandardDrawings plus structural calculations£1,650 – £3,400
PremiumComplex or two-storey pack with energy calculations£2,850 – £4,950

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

Want a range for your exact size? The guide-price tool takes about a minute.

Included in a typical project

  • Building regulations drawings and written specification
  • Structural calculations for beams, lintels and foundations
  • Submission to the council or a registered building control approver
  • Energy and glazing checks, including whole-house calculations if needed

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions answered

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for New Cross, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do you cover all of New Cross?

Yes. We cover New Cross and the surrounding parts of Greater London. Site visits are free and there is no obligation.

How long does this take for a New Cross home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

What are the insulation standards for an extension?

In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.

Book a free site visit in New Cross

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote