Building regulations for extensions in Lytham St Annes
For Lytham St Annes homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.
- Guide price in Lytham St AnnesFrom £850 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsFY8

Extensions in and around Lytham St Annes
Our survey diary covers Lytham St Annes, including FY8. Nearby, we also take on projects in Blackpool (6 miles), Poulton-le-Fylde (6 miles), Thornton-Cleveleys (9 miles), Preston (12 miles).
The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.
What it costs in Lytham St Annes
Guide fees for Lytham St Annes including VAT, using our North West England factor of ×0.95. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £850 – £1,750 |
| Standard | Drawings plus structural calculations | £1,200 – £2,500 |
| Premium | Complex or two-storey pack with energy calculations | £2,050 – £3,650 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Try the guide-price tool to see a range for your own size and finish.
Do I need planning permission in Lytham St Annes?
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What we take care of
- Energy and glazing checks, including whole-house calculations if needed
- Structural calculations for beams, lintels and foundations
- Building regulations drawings and written specification
- Submission to the council or a registered building control approver
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions answered
Do you cover all of Lytham St Annes?
Yes. We cover Lytham St Annes and the surrounding parts of Lancashire. Site visits are free and there is no obligation.
Who do I contract with in Lytham St Annes?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Will my neighbours in Lytham St Annes be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Book a free site visit in Lytham St Annes
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.