Building regulations for extensions in Hove
We prepare building regulations for extensions for homes in Hove, as a stand-alone service or as the first stage of a design and build project.
- Guide price in HoveFrom £1,000 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsBN1, BN2, BN3, BN41

Design and approval fees for Hove
These are guide fees for Hove, adjusted for South East England (×1.12) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £1,000 – £2,050 |
| Standard | Drawings plus structural calculations | £1,450 – £2,950 |
| Premium | Complex or two-storey pack with energy calculations | £2,450 – £4,300 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
For a figure based on your own dimensions, use our guide-price tool.
What is included
- Submission to the council or a registered building control approver
- Completion certificate on sign-off
- Inspection bookings throughout the build
- Building regulations drawings and written specification
- Structural calculations for beams, lintels and foundations
Will the council need to approve it?
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Local to Hove
Our survey diary covers Hove, including BN1, BN2, BN3, BN41. The same team covers Brighton (1 mile), Portslade (2 miles), Peacehaven (7 miles), Seaford (12 miles), all within easy reach.
Just over the West Sussex border, Shoreham-by-Sea is about 5 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Hove home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Hove
Do I need building regulations approval in Hove?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Hove?
Yes. We cover Hove and the surrounding parts of East Sussex. Site visits are free and there is no obligation.
How long does this take for a Hove home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Book a free site visit in Hove
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.