  • Guide price in HerefordFrom £850 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsHR1, HR4
Builder installing a steel beam over a new rear opening on acrow props

Design and approval fees for Hereford

Fees below are our Hereford guide (×0.97, the West Midlands factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£850 – £1,750
StandardDrawings plus structural calculations£1,250 – £2,550
PremiumComplex or two-storey pack with energy calculations£2,100 – £3,700

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

Want a range for your exact size? The guide-price tool takes about a minute.

Covering Hereford

Site visits are available across Hereford (HR1, HR4). We also work in nearby Ledbury (12 miles), Ross-on-Wye (12 miles), Leominster (12 miles).

The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

Do I need planning permission in Hereford?

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

When it helps

  • Homeowners using their own builder who need the drawings
  • Every extension, whatever the planning route
  • Glass-heavy designs that need energy calculations

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions answered

Will my neighbours in Hereford be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do you cover all of Hereford?

Yes. We cover Hereford and the surrounding parts of Herefordshire. Site visits are free and there is no obligation.

How long does this take for a Hereford home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

What are the insulation standards for an extension?

In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.

Book a free site visit in Hereford

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote