house-extension.uk

Building regulations for extensions across Hanworth

For Hanworth homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.

  • Guide price in HanworthFrom £1,150 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsTW2, TW12, TW13, TW14
Builder installing a steel beam over a new rear opening on acrow props

Design and approval fees for Hanworth

Guide fees for Hanworth including VAT, using our London factor of ×1.3. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£1,150 – £2,350
StandardDrawings plus structural calculations£1,650 – £3,400
PremiumComplex or two-storey pack with energy calculations£2,850 – £4,950

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

Want a range for your exact size? The guide-price tool takes about a minute.

When it helps

  • Glass-heavy designs that need energy calculations
  • Every extension, whatever the planning route
  • Homeowners using their own builder who need the drawings

Planning and approvals in Hanworth

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Covering Hanworth

Across TW2, TW12, TW13, TW14, we can visit, measure and advise. Nearby, we also take on projects in Hampton (2 miles), Feltham (2 miles), Hounslow (3 miles), Isleworth (3 miles).

Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Common questions in Hanworth

How long does this take for a Hanworth home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Do you cover all of Hanworth?

Yes. We cover Hanworth and the surrounding parts of Greater London. Site visits are free and there is no obligation.

Do I need building regulations approval in Hanworth?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

What are the insulation standards for an extension?

In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Book a free site visit in Hanworth

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote