Building regulations for extensions in Guildford
Need building regulations for extensions in Guildford? We survey the house, prepare what the council needs and deal with the officers until a decision is made.
- Guide price in GuildfordFrom £1,000 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsGU1, GU2, GU3, GU4, GU5

Extensions in and around Guildford
Our survey diary covers Guildford, including GU1, GU2, GU3, GU4, GU5, GU7. We also work in nearby Godalming (4 miles), Woking (6 miles), Farnham (10 miles), Camberley (10 miles).
The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
Fees in Guildford
Guide fees for Guildford including VAT, using our South East England factor of ×1.12. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £1,000 – £2,050 |
| Standard | Drawings plus structural calculations | £1,450 – £2,950 |
| Premium | Complex or two-storey pack with energy calculations | £2,450 – £4,300 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Want a range for your exact size? The guide-price tool takes about a minute.
When it helps
- Every extension, whatever the planning route
- Homeowners using their own builder who need the drawings
- Glass-heavy designs that need energy calculations
Planning and approvals in Guildford
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions answered
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Guildford, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Guildford be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Guildford?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Book a free site visit in Guildford
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end