house-extension.uk

Building regulations for extensions across Faversham

We prepare building regulations for extensions for homes in Faversham, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in FavershamFrom £1,000 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsME13
Builder installing a steel beam over a new rear opening on acrow props

What it costs in Faversham

Guide fees for Faversham including VAT, using our South East England factor of ×1.12. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£1,000 – £2,050
StandardDrawings plus structural calculations£1,450 – £2,950
PremiumComplex or two-storey pack with energy calculations£2,450 – £4,300

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

For a figure based on your own dimensions, use our guide-price tool.

What is included

  • Submission to the council or a registered building control approver
  • Energy and glazing checks, including whole-house calculations if needed
  • Building regulations drawings and written specification
  • Structural calculations for beams, lintels and foundations
  • Inspection bookings throughout the build

Working in Faversham

Postcode districts we cover around Faversham include ME13. We also work in nearby Whitstable (7 miles), Sittingbourne (7 miles), Canterbury (9 miles), Herne Bay (11 miles).

For homes towards Essex, Southend-on-Sea is around 17 miles away. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.

Will the council need to approve it?

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Common questions in Faversham

How long does this take for a Faversham home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Do you cover all of Faversham?

Yes. We cover Faversham and the surrounding parts of Kent. Site visits are free and there is no obligation.

Who do I contract with in Faversham?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Book a free site visit in Faversham

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote