Building regulations for extensions across Downpatrick
Need building regulations for extensions in Downpatrick? We survey the house, prepare what the council needs and deal with the officers until a decision is made.
- Guide price in DownpatrickFrom £750 inc VAT
- Approval routeFull plans or building notice to council
- Timescale2–5 weeks for drawings
- Postcode districtsBT30

Working in Downpatrick
We cover Downpatrick and the postcode districts BT30. Neighbouring towns we cover include Newtownards (18 miles), Bangor, County Down (23 miles), Banbridge (23 miles), Newry (28 miles).
Northern Ireland's housing ranges from city terraces to large numbers of detached houses and bungalows on rural plots, many in render, where single-storey extensions fit easily.
Design and approval fees for Downpatrick
These are guide fees for Downpatrick, adjusted for Northern Ireland (×0.86) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £750 – £1,550 |
| Standard | Drawings plus structural calculations | £1,100 – £2,250 |
| Premium | Complex or two-storey pack with energy calculations | £1,850 – £3,300 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Northern Ireland Executive.
Try the guide-price tool to see a range for your own size and finish.
What we take care of
- Building regulations drawings and written specification
- Inspection bookings throughout the build
- Energy and glazing checks, including whole-house calculations if needed
- Completion certificate on sign-off
Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.
Will the council need to approve it?
In Northern Ireland building control is run by the councils under the Building Regulations (Northern Ireland). We submit full plans or a building notice and book the inspections through to completion.
Homes in conservation areas, areas of townscape character and listed buildings have tighter rules, so we always check the property's status and planning history before design starts.
Building close to a public sewer needs the agreement of NI Water, which we check during design.
Northern Ireland has no Party Wall Act. Where work is on or close to a shared boundary, we agree access and protection with your neighbour in writing before work starts.
Applications are decided by your council, which handles local planning in Northern Ireland.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions answered
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Downpatrick, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Downpatrick be involved?
If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.
Do you cover all of Downpatrick?
Yes. We cover Downpatrick and the surrounding parts of County Down. Site visits are free and there is no obligation.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Book a free site visit in Downpatrick
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.